Excavation volume calculator
Surcharge rate %, include
How about this calculator?
- Gradient (%] calculator
- Slope (Hypotenuse] Calculator
- Angle (Right Triangle] Calculator
- Aggregate/Gravel Volume Calculator
- Rebar (Reinforcement] Quantity Calculator
- Horizontal Mortar Quantity Calculator
- Retaining Wall/Stone Wall Quantity Calculator
- Brick/Masonry Quantity Calculator
- Lube calculator
- Circular Column Calculator
- Stair Calculator
Please check.
- Failure to adhere to the safe slope ratio (gradient] for each soil type poses a high risk of excavation surface collapse, so please be sure to check the actual ground conditions at the site and enter the slope value.
- Since the excavated soil undergoes a change in volume rate (L value] due to the air layer, more dump trucks are required for transportation than calculated based on natural conditions.
- To ensure that the calculation matches the actual amount of soil to be excavated, you must add a margin of at least 50cm to 1m beyond the outer edge of the foundation to allow for formwork installation and securing a passage for workers.
- Please note that if the excavation depth is 1.5m or more, construction must be carried out after establishing separate safety reinforcement measures, such as temporary earth retaining structures, to ensure worker safety.
- If you confuse the actual measurement unit (mm/m], the calculation result may differ by more than 1,000 times, so please carefully check the selected unit next to the input field once again.
How about this calculator?
- Gradient (%] calculator
- Slope (Hypotenuse] Calculator
- Angle (Right Triangle] Calculator
- Aggregate/Gravel Volume Calculator
- Rebar (Reinforcement] Quantity Calculator
- Horizontal Mortar Quantity Calculator
- Retaining Wall/Stone Wall Quantity Calculator
- Brick/Masonry Quantity Calculator
- Lube calculator
- Circular Column Calculator
- Stair Calculator
Excavation and Soil Volume Calculation Formulas
Excavation volume is not a simple rectangular prism. To ensure accuracy, a volume formula in the shape of a truncated square must be used, taking into account the slope gradient for collapse prevention and the clearance for floor work.
1. Calculation of Excavation Volume (Natural Condition]
2. Reflection of Soil Volume Change Rate (L] (Transport Status]
When compacted soil is excavated, its volume increases. Typically, dump truck volumes are calculated by applying L=1.2–1.3 for general soil and L=1.5 or more for bedrock.
Detailed description of calculator input items
Please enter values appropriate for the site conditions to accurately calculate the soil quantity.
-
1. Pit width/length
These are the width and length dimensions of the foundation floor area where the actual structure will sit.
-
2. Depth of the pit
This is the vertical depth (height] to be excavated from the ground surface (G.L] to the bottom surface (E.L].
-
3. Soil Selection
When you select the type of soil at the site (sand, clay, bedrock, etc.], the standard soil volume change rate (L value] is automatically applied.
-
4. Slope ratio 1:N
This is the slope gradient for preventing collapse. (e.g., 1:0.5 means retreating 0.5m horizontally for every 1m dug vertically]
-
5. Clearance
It is the width of the excavation extending beyond the structural foundation line to allow for formwork assembly or worker movement passages.
Standard Specifications for Safe Slope and Soil Volume Change Rate by Soil Type
These are the recommended values for each ground type according to the Standard Cost Estimation for Construction Works and the Industrial Safety and Health Standards.
Essential Checklist for Fail-Free Construction
Here are tips to prevent common mistakes and safety accidents on site.
-
Work clearance is essential
Do not dig exactly to the size of the foundation; secure a clearance of at least 50cm to 1m for formwork installation.
-
Check the laser level frequently
If you rely on the equipment operator's intuition, the level may not be correct. Digging too deep will result in high concrete costs.
-
Considering the reality of truck payloads
The cargo bed of a 15-ton dump truck holds 10 cubic meters, but it is often loaded with only 8 to 9 cubic meters, so please allocate about 10% extra.
-
Safety First and Unit Attention
For depths of 1.5m or more, a review of temporary earth retaining structures is required. Please be sure to check the m and mm units when entering data.
Frequently Asked Questions (FAQ]
- Q. How much soil can be loaded into a 15-ton dump truck?
- A. It is approximately 10 cubic meters in volume and about 15 tons in weight. Wet soil or rock may be less than this.
- Q. What is 'Satojang'?
- A. This is a disposal site for excavated soil. If you arrange it in advance, you can reduce transportation and disposal costs.
- Q. What does a slope ratio of 1:N mean?
- A. It means to dig by spreading outward horizontally by N meters for every 1 meter you go down vertically. The larger the number, the safer it is.